Site manager; Jesper Frederiksen has originally made the agreement with CWind and he has instructed Beansy to task, and his role in that the MS has been given oral and written.
there are corrective actions that can be implemented as means of communication with subcontractor ensure a fast and precise adjustment of the process can be carried out, so you can react before,There is an unexpected stop and so that potential problems are found, can be corrected before the cost of time and the economy?
• CTO's functional description/instruction is enhanced by subsequent time was Surveyer from Line with out for tone generator to start-up and adjustment to display this two subcontractors tone generator technichians
Beansy should have called the vessel to confirm that everything was set up correctly, that is the procedure and a general requirement from CTO to subcontractor to subcontractor call the CTO (ship or Site Manager) after the task is completed but since this was the first time, the principle does not complete (the principle is that there must be a out there, but if it is running it is ok to take away. )
Here then, CTO introduced to:
• ships and engineers have direct contact together in puzzle solving experience.
• Ships should continually update on when it is expected that the work will be carried out by CTO vessel sends a 5 days look ahead two subcontractors tone generator technichians so they know when job is expected.